
Designing Interstitial Spaces for Future Security Inspections
A client developing a multi-story secure facility encountered challenges related to interstitial (between) spaces located above secure areas but below the upper hard deck. Although the architectural and mechanical designs met overall project objectives, insufficient consideration had been given to how future security inspections, maintenance activities, and accreditation reviews would be conducted within these spaces. SPG partnered with the owner, design professionals, and construction team to evaluate accessibility, inspection pathways, wall termination details, and long-term security requirements. Recommendations were incorporated into the project before construction advanced, ensuring the interstitial spaces could be properly inspected and maintained throughout the facility lifecycle. As a result, the project avoided future compliance concerns, reduced the likelihood of costly modifications, and maintained its accreditation schedule.