top of page

News & Insights
All Posts


ICD 705 Some Design and Construction Points
With the foundation stones in place, the next critical piece is ensuring expertise with ICD 705 in both the Design and Construction process. Keep in mind that ICD 705 specifically calls out a requirement for having an SSM (Site Security Manager) on your project and this person should have the expertise to ensure there are no issues with ICD 705 policy compliance. This consists of everything from critical design reviews, to thorough comprehension of construction methodologies
Jason Phillippe
Nov 9, 2019


ICD 705 Tech Spec Requirements For Type A, B, or C Wall?
The ICD 705 Technical Specifications for Sensitive Compartmented Information Facilities (“Tech Specs”) depict three different wall types that are “suggested” for achieving compliance with acoustic and RF requirements for SCIF and SAPF space: A common misperception is that only ONE of these wall types can be built, but this isn’t true. In fact, it’s a pretty good sign your project lacks expertise if your GC isn’t considering a plethora of factors that might internally and exte
Jason Phillippe
Nov 8, 2019


All About Vestibule in SCIF
One of the most common questions I’m asked is, “Do I need a Vestibule?” The exact language of the ICD 705 policy is as follows: E. SCIF Door Criteria “2. When practical, entrance doors should incorporate a vestibule to preclude visual observation and enhance acoustic protection. “ The answer is a definite “YES!” The underlying intent of the above policy language is that you always include incorporating a Vestibule whenever possible because of the Security value it brings, i
Jason Phillippe
Nov 7, 2019


Leasing a Sensitive Compartmented Information Facility (SCIF)
It is the proverbial “Chicken or the Egg” scenario…The RFP (Request for Proposal) you want to pursue requires a SCIF. You may be a small company that doesn’t have a DD254 yet (form justifying contractual use of a SCIF), a medium size company that lacks a DD254 that specifies TS/SCI, or a large company with a SCIF with no square footage to spare and having to justify the expenditure of expanding or relocating to a larger space. These issues are faced by companies nationwide
Jason Phillippe
Nov 4, 2019


STC: Deciphering ICD 705 Acoustic Requirements and when “testing” is required (Part I)
Deciphering ICD 705 Acoustic Requirements and when “testing” is required.
Jason Phillippe
Nov 3, 2019


STC: Deciphering ICD 705 Acoustic Requirements and when “testing” is required (Part II)
ICD 705 further provides for three separate means of testing for acoustic integrity.
Jason Phillippe
Nov 3, 2019


De-mystifying TEMPEST
TEMPEST is one of the most misunderstood (and least understood) aspects of ICD 705, but here are the magic steps to de-mystifying this...
Jason Phillippe
Nov 2, 2019
bottom of page